Muskiz School

“Public architecture of the future with CLT structure and Passivhaus standards”

This is the first project that the Education Department has put into motion in matters of sustainability and implementation of contemporary constrution methods. Industrialized manufacturing and drywall construction are carried out, ensuring a precise cost and quality control and cutting down the construction time on site. The design outlines a timber CLT structure and a custom-made ceramic ventilated façade.

Copyright 2019 | All rights reserved | Privacy Policy


Scroll to Top