Urretxindorra School Remodeling

Program: Education

Status: Built

Client: Urretxindorra School

Year: 2019

Built Area: 9000 sqm

Photographer: Aitor Estévez

“From an old furniture factory to the new corporate image of the school”
A group of psychologists, sociologists, pedagogues and teachers begins a process of reflection to define the new teaching model of the center. BAT leads the design process of the new centre based on this model. As a result, a new building is designed and built and an integral reform of the existing building is made.
Scroll to Top